Finishing Stages of Construction in Minnesota – Heating For Contractors, Materials and Equipment

A repeat customer of REIC Specialty requested climate control equipment for several stages of construction on a new building in Minnesota. The contractor approached REIC well before the project broke ground and had outlined the stages that would require climate control. REIC had provided heating the previous year during the brick and concrete phases, cooling and dehumidification during the summer, and was now asked to return for another winter to provide heating for the final stages.

Emergency Cooling Rental Helps Ontario, Canada Mine

A call came in late on a Friday about a facility needing emergency cooling. By Saturday afternoon, two 30 Ton AC units had been delivered, setup and were delivering cooling to bring an entire mining operation back online.

Heating 3 Million Square Feet with Jet Heaters & 24/7 Service on Construction Project in Midwest

With a floor plan spanning over 3 million square feet, performing interior construction during winter in the Midwest can prove challenging. The general contractors on this project had previously been using a standard heater line that they typically use on other projects, with limited success. Given the massive scale of this building, traditional heaters were not delivering the temperatures desired, nor were they pushing heat to the interior of the building.