Interior Construction on Iowa Federal Building Uses Cooling to Maintain Schedule and Finish on Time

A past customer who had rented heating reached out to REIC
Specialty for some summer cooling rentals while working on a project in Iowa.
As the interior construction phase of the project began, the summer heat
was rising. With the building completely enclosed, humidity and temperature
control became a necessity to maintain progress.
New Construction in Minnesota Relies on Rental Make Up Air Heaters to Maintain Schedule During Winter

During construction of a multi-story facility underway, the job site Superintendent of the project knew that winter would either make or break the project schedule. Protecting their schedule and managing the interior conditions during the winter. The idea was that if they could manage their budget and have temporary heating installed, it may work out.
New Construction on a Storage Facility Proceeds With Temporary Heating During Concrete Pours and Finishing

During the early phases of construction a general contractor sought temporary heating during construction. With exterior walls and roofing nearing completion, both concrete flooring and interior construction would require heating during the cold of a South Dakota winter.
Finishing Stages of Construction in Minnesota – Heating For Contractors, Materials and Equipment

A repeat customer of REIC Specialty requested climate control equipment for several stages of construction on a new building in Minnesota. The contractor approached REIC well before the project broke ground and had outlined the stages that would require climate control. REIC had provided heating the previous year during the brick and concrete phases, cooling and dehumidification during the summer, and was now asked to return for another winter to provide heating for the final stages.
Jet Heater Improves Working Conditions and Saves Money For Concrete Contractor on High-rise Building Project

A single jet heater was lifted atop a building under construction. As a result, a concrete contractor never worked the same again. On a high-rise building under construction in Manhattan, a concrete contractor poured each concrete slab, one floor after another.
Temporary Heating for New Construction of a Hotel During Winter in Minnestoa

With the winter approaching, a longtime customer of REIC
Specialty reached out for help during the interior work of a new construction
project. The four-story hotel under construction had exterior framing
complete and the building was moving to interior work, including drywall.
Emergency Cooling Rental Helps Ontario, Canada Mine

A call came in late on a Friday about a facility needing emergency cooling. By Saturday afternoon, two 30 Ton AC units had been delivered, setup and were delivering cooling to bring an entire mining operation back online.
Oil Production Site Learns Benefits and Cost Savings of Jet Heater

During a visit at a production pad where workover activity was being performed, a Cahill sales rep noticed rental heaters already in use on the site. After a short conversation they asked the site manager if they would like to experience an alternative?
Heating 3 Million Square Feet with Jet Heaters & 24/7 Service on Construction Project in Midwest

With a floor plan spanning over 3 million square feet, performing interior construction during winter in the Midwest can prove challenging. The general contractors on this project had previously been using a standard heater line that they typically use on other projects, with limited success. Given the massive scale of this building, traditional heaters were not delivering the temperatures desired, nor were they pushing heat to the interior of the building.
Saving Labor and Emissions and Gaining Data With Solar Hybrid Light Towers on a Construction Project

While building a new manufacturing plant in Texas, a large international technology company grew tired of the labor required for its existing solar light towers. The firm also wanted to monitor the job site more closely, which was not possible until REIC entered the job.