Explore our Case Studies to see how REIC Specialty delivers innovative, reliable rental solutions across Oil & Gas, Construction, Industrial, and Event sectors. From complex climate control challenges to specialized power and ventilation solutions, our real-world success stories showcase our expertise, efficiency, and commitment to customer success. See how we’ve helped businesses overcome challenges, improve operations, and achieve their goals.

Categories

Constructing a dam with more than two million cubic meters of concrete requires a massive effort of manpower and equipment. Year after year as the project continued, Cahill became more essential to the success of this project than ever imagined.
When building a multi-story building with 100,000 square foot floors, a powerful heater is needed to deliver heat across such a large space. The general contractor for this project relied on a past rental heater they had used on other projects, but it did not get the results they needed. Following weeks of heat not reaching the upper floors from low static pressure, the GC was concerned when temperature requirements were not met and the project schedule was threatened due to interior finish work falling behind.
Missouri – Despite having an advanced HVAC system, a large manufacturing plant faced significant challenges in controlling indoor humidity levels. High humidity was causing product clumping, machinery jams, and frequent production line shutdowns, resulting in substantial financial losses. Nearly 70% of their product was rendered unusable due to humidity-related issues, so the facility knew a solution was critical. After initial discussions, REIC Specialty was brought in to evaluate the situation and recommend an action plan.
Wisconsin – An industrial painting company undertaking the first phase of an interior tank painting project enlisted REIC Specialty to manage climate control. With a diameter exceeding 200 feet and a floating ceiling, the tank required surface blasting and steel preparation ahead of the industrial paint application in phase two.
Illinois – Facing persistently high humidity levels in several facilities, the plant managers of a national agricultural storage company convened to address the issue. Their primary goal was to ensure the long-term storage of agricultural products. However, their data revealed that elevated humidity levels were compromising the viability of their products—and their revenue.
Connecticut – As fall and winter approached, the contractor overseeing the construction of a new university building recognized the urgent need for climate control. With concerns about worker safety, protecting building materials, and maintaining the construction schedule, colder weather posed significant risks, including missed deadlines. Heating the site was essential to mitigating these challenges.
Connecticut – As the colder fall months settled in, outdoor work became increasingly challenging—especially for the construction of a multi-story building. Recognizing the risk of slowed progress and worker safety concerns, a New England contractor returned to REIC Specialty for a customized heating solution tailored to the project’s needs.
Northern Illinois – After several winters of relying on small, portable heaters with limited success, a Northern Illinois warehouse and distribution center upgraded its temporary heating approach. Unable to absorb the cost of a new permanent HVAC system, the company had relied on temporary heating in previous years. While the smaller heaters provided some relief, they were costly to operate due to high fuel consumption. Seeking a more efficient and cost-effective solution, the company turned to REIC Specialty for recommendations.
An event space recently contacted TCR to help provide cool and comfortable conditions for their summer events in a facility without a permanent HVAC system. This large, antiquated building offered electric connections and high roofs but lacked any cooling on the premises. With years of experience working on similar projects, the TCR team knew how to deliver the necessary conditions.
When water damage occurred at a prestigious college in Connecticut, the moisture and potential issues were an immediate concern and required quick drying. Contacted by a local restoration company, T.C.R. promptly mobilized and responded with drying equipment.