Explore our Case Studies to see how REIC Specialty delivers innovative, reliable rental solutions across Oil & Gas, Construction, Industrial, and Event sectors. From complex climate control challenges to specialized power and ventilation solutions, our real-world success stories showcase our expertise, efficiency, and commitment to customer success. See how we’ve helped businesses overcome challenges, improve operations, and achieve their goals.

Categories

A past customer who had rented heating reached out to REIC Specialty for some summer cooling rentals while working on a project in Iowa. As the interior construction phase of the project began, the summer heat was rising. With the building completely enclosed, humidity and temperature control became a necessity to maintain progress.
During construction of a multi-story facility underway, the job site Superintendent of the project knew that winter would either make or break the project schedule. Protecting their schedule and managing the interior conditions during the winter. The idea was that if they could manage their budget and have temporary heating installed, it may work out.
During the early phases of construction a general contractor sought temporary heating during construction. With exterior walls and roofing nearing completion, both concrete flooring and interior construction would require heating during the cold of a South Dakota winter.
A repeat customer of REIC Specialty requested climate control equipment for several stages of construction on a new building in Minnesota. The contractor approached REIC well before the project broke ground and had outlined the stages that would require climate control. REIC had provided heating the previous year during the brick and concrete phases, cooling and dehumidification during the summer, and was now asked to return for another winter to provide heating for the final stages.
With the winter approaching, a longtime customer of REIC Specialty reached out for help during the interior work of a new construction project. The four-story hotel under construction had exterior framing complete and the building was moving to interior work, including drywall.
A call came in late on a Friday about a facility needing emergency cooling. By Saturday afternoon, two 30 Ton AC units had been delivered, setup and were delivering cooling to bring an entire mining operation back online.
During a visit at a production pad where workover activity was being performed, a Cahill sales rep noticed rental heaters already in use on the site. After a short conversation they asked the site manager if they would like to experience an alternative?
Missouri – Despite having an advanced HVAC system, a large manufacturing plant faced significant challenges in controlling indoor humidity levels. High humidity was causing product clumping, machinery jams, and frequent production line shutdowns, resulting in substantial financial losses. Nearly 70% of their product was rendered unusable due to humidity-related issues, so the facility knew a solution was critical. After initial discussions, REIC Specialty was brought in to evaluate the situation and recommend an action plan.
Wisconsin – An industrial painting company undertaking the first phase of an interior tank painting project enlisted REIC Specialty to manage climate control. With a diameter exceeding 200 feet and a floating ceiling, the tank required surface blasting and steel preparation ahead of the industrial paint application in phase two.
Illinois – Facing persistently high humidity levels in several facilities, the plant managers of a national agricultural storage company convened to address the issue. Their primary goal was to ensure the long-term storage of agricultural products. However, their data revealed that elevated humidity levels were compromising the viability of their products—and their revenue.