Explore our Case Studies to see how REIC Specialty delivers innovative, reliable rental solutions across Oil & Gas, Construction, Industrial, and Event sectors. From complex climate control challenges to specialized power and ventilation solutions, our real-world success stories showcase our expertise, efficiency, and commitment to customer success. See how we’ve helped businesses overcome challenges, improve operations, and achieve their goals.
Categories
During construction of a multi-story facility underway, the job site Superintendent of the project knew that winter would either make or break the project schedule. Protecting their schedule and managing the interior conditions during the winter. The idea was that if they could manage their budget and have temporary heating installed, it may work out.
During the early phases of construction a general contractor sought temporary heating during construction. With exterior walls and roofing nearing completion, both concrete flooring and interior construction would require heating during the cold of a South Dakota winter.
A repeat customer of REIC Specialty requested climate control equipment for several stages of construction on a new building in Minnesota. The contractor approached REIC well before the project broke ground and had outlined the stages that would require climate control. REIC had provided heating the previous year during the brick and concrete phases, cooling and dehumidification during the summer, and was now asked to return for another winter to provide heating for the final stages.
A single jet heater was lifted atop a building under construction. As a result, a concrete contractor never worked the same again. On a high-rise building under construction in Manhattan, a concrete contractor poured each concrete slab, one floor after another.
With the winter approaching, a longtime customer of REIC Specialty reached out for help during the interior work of a new construction project. The four-story hotel under construction had exterior framing complete and the building was moving to interior work, including drywall.
A call came in late on a Friday about a facility needing emergency cooling. By Saturday afternoon, two 30 Ton AC units had been delivered, setup and were delivering cooling to bring an entire mining operation back online.